Guides·July 2026

Commercial kitchen requirements: the checklist

Every jurisdiction writes its own health code, but they're all built on the same skeleton — and inspectors in DC, Maryland, and Virginia check the same fundamentals. This is the checklist we design kitchens against. If your space misses items on it, that's your renovation scope.

Ventilation and fire

  • Type I hood over all grease-producing equipment (fryers, ranges, griddles, charbroilers), with ductwork to the roof and a UL 300 fire-suppression system.
  • Type II hood over heat-and-steam equipment like dishwashers and some ovens.
  • Make-up air to replace what the hoods exhaust — without it the kitchen runs hot and doors whistle.
  • Clearances to combustibles and access panels for duct cleaning per NFPA 96.

Plumbing and grease

  • Grease interceptor sized to the fixture load, per the local FOG program — under-sized traps are a common reason older spaces can't be re-permitted as-is.
  • Three-compartment sink for wash/rinse/sanitize, plus a separate food-prep sink with an indirect (air-gapped) drain.
  • Dedicated handwash sinks — within reach of every work area, with soap and towel fixtures; inspectors fail kitchens over this constantly.
  • Mop/service sink, backflow prevention on carbonators and hose bibs, and hot water capacity sized to the fixture count.

Surfaces, storage, and equipment

  • Floors: smooth, durable, non-absorbent (quarry tile or troweled epoxy), with coved bases at walls.
  • Walls and ceilings: cleanable and non-absorbent in food and dish areas — FRP, tile, or washable panels.
  • Commercial equipment listed to NSF/ANSI standards, on legs or casters for cleaning underneath.
  • Refrigeration that holds 41°F or below with visible thermometers; adequate dry storage off the floor.
  • Lighting at code intensities with shatter-resistant covers over food areas.

The plan-review trap

In every DMV jurisdiction, the health department reviews kitchen plans before you build. Owners who design first and submit later end up rebuilding on paper — or worse, in the field. Design against this checklist, submit early, and treat reviewer comments as free consulting.

Not sure your space can pass?

We'll walk the space against this checklist and tell you exactly what it needs — before you sign or build.